Hill Dickinson Stadium

Photo David Dixon · CC BY-SA 2.0 · Wikimedia Commons

Liverpool · EN · England

Hill Dickinson Stadium

Hill Dickinson Stadium

Everton's home since 2025, built on the filled-in Bramley-Moore Dock in Vauxhall, Liverpool, to replace Goodison Park. Its steel-and-glass bowl is the result of a long search for a site.

Capacity52,888Opened2025Record attendance52,590Pitch105 × 68 m

The facts

Capacity
52,888
Opened
17 February 2025
Pitch
105 × 68 m
Coordinates
53°25′N · 3°00′W
Built
2025

Everton F.C.

Bramley-Moore Dock, Vauxhall, Liverpool

The history

Everton played at Goodison Park from 1892. The Taylor Report of 1990 cut its capacity from more than 78,000 to just over 39,000, and the ground was constrained by its construction. Plans to leave date back to the mid-1990s. A site at King's Dock was identified around 2001 and then abandoned for lack of funds, a 2006 plan for Kirkby was rejected by central government in 2009, and a Walton Hall Park scheme of 2014 was scrapped in 2016.

Bramley-Moore Dock was named the preferred site at the club's annual general meeting in January 2017. In March 2017 Liverpool City Council approved a special purpose vehicle to guarantee the financing, and in November 2017 the club agreed a 200-year lease with Peel Holdings. A naming-rights deal with USM Holdings, reported at £30 million, was agreed in January 2020. In March 2022 Everton said it would no longer receive a council loan and had arranged other finance.

Laing O'Rourke began construction in July 2021, after Covid delays, assembling factory-made steel and precast concrete on site. A worker, Michael Jones, died after a fatal accident in August 2023, and a memorial was unveiled outside the stadium in August 2024. The stadium was declared structurally complete in February 2024 and handed over by the contractor in December 2024.

The site lay within the Liverpool Maritime Mercantile City World Heritage Site. UNESCO criticised the scheme, and the development at Bramley-Moore Dock was one of the reasons it gave for recommending that the city lose its status; the revocation was confirmed in July 2021.

Three test events were held in 2025: an Everton Under-18 match against Wigan Athletic Under-18s on 17 February, a sold-out Under-21 friendly against Bolton Wanderers' B side on 23 March, and a pre-season friendly against Roma on 9 August, which drew 50,837. The first competitive match was against Brighton & Hove Albion on 24 August 2025, which Everton won 2-0. The stadium was announced in 2023 as one of ten venues for UEFA Euro 2028.

Great moments

2025
Premier LeagueEverton2-0Brighton & Hove Albion
opening match
2025
Pre-season friendly (certification test)Everton0-1Roma
2025
2025 Rugby League AshesEngland4-14Australia
2026
2026 Nations ChampionshipFiji8-73England

Records

Record attendance
52,590
Everton v Sunderland, 17 May 2026
First goal at the stadium
Harrison Rimmer
Wigan Athletic Under-18s v Everton Under-18s, 17 February 2025, 12th minute
First penalty saved at the stadium
Jordan Pickford
Denied Danny Welbeck, Everton v Brighton & Hove Albion, 24 August 2025

Home to

Everton

Home ground from the 2025-26 season. Everton Women also play select home fixtures here from 12 October 2025.

Getting there

Rail

Sandhills station, on the Merseyrail network, serves the ground. It was enlarged between March and December 2024 with a fan zone in its car park, and an additional footbridge opened in 2025 to cope with match-day crowds.

Get directions

Tour

Stadium tour

The club's own page should be checked for tour details.

The neighbourhood

The stadium stands at Bramley-Moore Dock in Vauxhall, Liverpool, on the site of a former commercial dock. The dock was filled in during construction, using reclaimed sand from the River Mersey.

The development was intended to become the centre of a wider mixed-use area of shops, housing, sports facilities and other venues. Sandhills station, on the Merseyrail network, serves the ground; its enlargement between March and December 2024 added a fan zone in its car park and a footbridge opened in 2025.